Skip to main content

Production Checklist

Use this checklist to verify your STELLA deployment is ready for production.

Security

Authentication & Authorization

  • API authentication enabled - Secure all endpoints
  • LiveKit tokens validated - Verify token signatures
  • HTTPS enabled - TLS certificates configured
  • CORS configured - Only allow trusted origins
  • Rate limiting enabled - Prevent abuse

Secrets Management

  • No hardcoded secrets - All secrets in environment variables
  • Kubernetes secrets used - Not ConfigMaps for sensitive data
  • Secret rotation plan - Process to rotate API keys
  • Minimal permissions - Least privilege principle

Network Security

  • Network policies - Restrict pod-to-pod communication
  • Ingress secured - TLS termination at ingress
  • Internal services private - Only expose what's needed

Infrastructure

Kubernetes

  • Resource limits set - CPU and memory for all pods
  • Health checks configured - Liveness and readiness probes
  • Pod disruption budgets - Maintain availability
  • Horizontal Pod Autoscaler - Scale backend on demand
  • Node affinity - Agents on appropriate nodes

Database

  • Backups configured - Regular automated backups
  • Backup testing - Restore tested periodically
  • Connection pooling - PgBouncer or similar
  • Replication - High availability setup
  • Monitoring - Query performance tracked

Storage

  • Persistent volumes - Data survives restarts
  • Storage class appropriate - SSD for database
  • Backup storage - Separate from primary

Monitoring

Metrics

  • Prometheus configured - Scraping all services
  • Key metrics defined:
    • Request latency
    • Error rates
    • Active sessions
    • Agent pod count
    • Database connections

Logging

  • Structured logging - JSON format
  • Log aggregation - Centralized logging (ELK, Loki)
  • Log retention policy - Storage management
  • Sensitive data filtered - No secrets in logs

Alerting

  • Alert rules defined:
    • High error rate
    • Service down
    • High latency
    • Resource exhaustion
  • Alert channels configured - Slack, PagerDuty, etc.
  • Runbooks created - Response procedures

Tracing

  • Distributed tracing - Jaeger or similar
  • Trace sampling - Balance detail and cost
  • Cross-service correlation - Request IDs

Performance

Latency

  • Response time targets - P50, P95, P99 defined
  • CDN configured - Static assets cached
  • Database indexes - Optimized queries
  • Connection reuse - HTTP keep-alive

Capacity

  • Load testing completed - Know your limits
  • Capacity planning - Growth projections
  • Graceful degradation - Behavior under load

Reliability

High Availability

  • Multi-replica deployment - No single points of failure
  • Cross-zone deployment - Survive zone failure
  • Database HA - Primary/replica setup

Disaster Recovery

  • Recovery plan documented - Steps to restore
  • RTO defined - Recovery time objective
  • RPO defined - Recovery point objective
  • DR testing - Regular drills

Rollback

  • Rollback procedure - Quick version revert
  • Blue-green or canary - Safe deployment strategy
  • Feature flags - Gradual rollout

Operations

Documentation

  • Architecture documented - System diagrams
  • Runbooks created - Operational procedures
  • On-call rotation - Response coverage

Maintenance

  • Update procedure - Zero-downtime updates
  • Dependency updates - Security patches
  • Certificate renewal - Automated if possible

Configuration Reference

Production Environment Variables

# Application
NODE_ENV=production
LOG_LEVEL=info

# Database
DATABASE_URL=postgresql://user:pass@db:5432/stella?sslmode=require
DATABASE_POOL_SIZE=20

# LiveKit
LIVEKIT_URL=wss://livekit.yourdomain.com
LIVEKIT_API_KEY=your-api-key
LIVEKIT_API_SECRET=your-api-secret

# Security
JWT_SECRET=your-secure-jwt-secret
CORS_ORIGINS=https://yourdomain.com

# Monitoring
OTEL_EXPORTER_OTLP_ENDPOINT=http://jaeger:4318

Resource Recommendations

ServiceCPU RequestCPU LimitMemory RequestMemory Limit
Backend500m2000m512Mi2Gi
Frontend100m500m128Mi512Mi
PostgreSQL500m2000m1Gi4Gi
stella-agent250m1000m512Mi2Gi

Pre-Launch Checklist

Final Verification

  • All environment variables set correctly
  • SSL certificates valid and not expiring soon
  • DNS configured and propagated
  • Monitoring dashboards accessible
  • Alert notifications working
  • Backup recovery tested
  • Load test results acceptable
  • Security scan completed
  • Documentation reviewed and updated

Launch Day

  • Team aware of launch time
  • On-call coverage confirmed
  • Communication channels ready
  • Rollback procedure understood
  • Monitoring dashboards open

Next Steps